Zedernholzzaun Rechner
Berechne Zedernholzbretter, 2x4 Riegel, Pfosten und Betonsäcke für langlebige Sichtschutzzäune mit Präzision.
Zaunrechner
Geben Sie Ihre Werte ein. Jedes Ergebnis wird live aktualisiert und zeigt seine Formel.
Übersicht
Rote Zeder (Western Red Cedar) enthält natürliche Harze und Ole, die Fäulnis und Schadlinge ohne chemische Kesseldruckimprägnierung abwehren.
Zedernholz arbeitet weniger als Kiefer, verlangt jedoch Edelstahlschrauben oder feuerverzinkte Befestiger, um schwarze Gerbsäure-Laufspuren dauerhaft zu verhindern.
Annahmen
- Calculations use standard 1x6 (5.5 in actual width) or 1x4 (3.5 in actual width) cedar picket dimensions.
- Posts are spaced on 6ft or 8ft centers and embedded to standard depth based on fence height.
- Each post hole includes a 6-inch crushed gravel drainage base underneath the concrete collar.
- Fastener estimates assume hot-dipped galvanized or ceramic exterior screws.
Häufige Fehler
- Verwendung unpassender verzinkter Schrauben, die mit den Tanninen des Zedernholzes schwarze Verfarbungen bilden.
- Bodenkontakt der Zaunbretter mit feuchter Erde, wodurch Staunasse in das Stirnholz zieht.
- Eingraben von Zedernpfosten ohne Kiesdrainage am Bohrlochboden.
- Vergessen des 10-prozentigen Verschnittzuschlags für Astausbrüche und Passschnitte.
Zaunformeln
Dieselbe Mathematik wie im Rechner, in klaren Worten. Nichts ist eine Blackbox.
-
Abschnitte
sections = max(ceil(effective run / post spacing), 1)
-
Pfostenzahl
posts = (sections + 1) along the run, minus named corner and end posts already placed, plus 2 gate posts per gate
-
Effektive Strecke
effective run = total length - sum of gate widths
-
Riegelzahl
total rails = sections x rails per section
-
Lattenzahl
pickets = ceil(run in inches / (picket width + gap)); total = ceil(raw x (1 + waste %))
-
Board-on-Board-Teilung
pitch = picket width - 1 inch overlap
-
Plattenzahl
full panels = floor(run / panel width); add 1 cut panel if the remainder is over 0.01 ft; total = ceil(raw x (1 + waste %))
-
Betonvolumen
per-hole = pi x (diameter / 2)^2 x depth; total = per-hole x posts; bags = ceil(total / bag yield)
-
Angepasste Gefältestrecke
slope run = effective run / cos(atan(slope % / 100)); shown alongside, counts use the flat run
-
Kosten
materials = (posts x post price + rails x rail price + infill x unit price + 60 lb bags x bag price) x regional multiplier; labor = effective run x labor per ft x terrain multiplier x regional multiplier; installed total = materials + gate hardware + removal + permit + labor
Jede Zahl im Tool stammt aus diesen Formeln auf deine Eingaben.
Nächster Schritt
- Zaunfleckenrechner Berechnen Sie, wie viel Zaunfleck beide Seiten eines Laufs für einen, zwei oder drei Schichten bedeckt, in Gallonen und 5-Gallonen-Eimern.
- Zaunpfostenrechner Berechnen Sie Linienpfosten, Eckpfosten und Endpfosten anhand der Lauflänge und des Abstands, wobei Beton für jeden Pfosten in der Abnahme enthalten ist.
Verwandte Rechner
- Holzzaun-Rechner Berechnen Sie Pfosten, Schienen, Latten und Beton für einen druckimprägnierten Kiefern-, Zedern- oder Mammutbaumzaun. Alle angezeigten Formeln, Kosten optional.
- Datenschutzzaun-Rechner Berechnen Sie Pfosten, Geländer und Latten für einen soliden Sichtschutzzaun aus jedem Material, standardmäßig mit einem lückenlosen Bretterlayout.
- Redwood Zaun Rechner Ermittle Lamellen, Trager, Pfosten und Betonmengen für elegante Redwood-Sichtschutzzäune mit exakten Maßeinheiten.
- Kesseldruckimprägnierter Zaun Rechner Plane Sichtschutzzäune aus imprägnierter Kiefer mit passender Lattenzahl, Erdanker und Beton.
Weiterführende Lektüre
Ausführliche Leitfäden
Kaufratgeber
Western Red Cedar and Northern White Cedar carry natural oils and tannins that resist decay and insect damage without a chemical pressure treatment, which is the main reason cedar commands a higher price than pine for the same board. The post, rail and picket formulas behind this page are the same ones the general wood fence calculator uses for every species; this page simply defaults the material to cedar and its common board sizes, since that is the usual reason someone lands here specifically rather than on the general tool.
Cedar's tannins react with plain steel fasteners, leaving black streaks down the face of a picket, so stainless steel or hot-dipped galvanized nails and screws are worth budgeting for alongside the lumber itself. A privacy layout, the most common cedar fence style, has no gap between boards, so the picket count is just run length divided by board width before waste, the same formula this calculator applies for cedar's standard 1x6 or 1x4 dimensions.
Against the other premium species covered on this site, redwood shares cedar's natural rot resistance and similar fastener requirements at a different price point and regional availability, while pressure-treated pine relies on chemical treatment rather than natural oils and is the lower-cost option most builders compare cedar against. None of the three change the post or rail formulas; the difference is entirely in cost, expected service life, and the fastener and drainage details each species calls for.
Posts set in concrete benefit from a gravel drainage layer under the footing regardless of species, which the fence post calculator accounts for when sizing holes. Once the lumber order is set, the fence stain calculator figures out how much finish a cedar fence needs once it has dried enough to accept it. How much does a wood fence cost and how to install a wood privacy fence cover budgeting and the build sequence, and the fence materials guide and wood fence installation guide go deeper on both. The wood fence calculators hub links every other species and style.
Kiln-dried cedar is close to its final dimension and ready to stain right away, while green, unseasoned cedar needs 2 to 4 weeks of drying time outdoors, until moisture content drops below roughly 15 percent, before an oil-based stain will take properly. That distinction does not change the board, rail or post counts this calculator returns, but it does change the project timeline, since staining too early on green cedar traps moisture under the finish rather than protecting the wood.
Keeping the bottom of cedar pickets at least a couple of inches above soil or mulch, rather than letting them sit in contact with wet ground, is one of the more overlooked details on a cedar build, since cedar's natural rot resistance is strongest against airborne decay and weaker against sustained ground moisture wicking up through the end grain. A sacrificial pressure-treated rot board along the bottom of the run is a common, low-cost way to protect the cedar pickets above it without changing the picket count itself.
Cedar also varies by cut and grain orientation in ways that affect how it weathers: vertical-grain boards, cut so the growth rings run roughly perpendicular to the face, resist cupping and warping better than flat-grain boards over time, which matters more on wider pickets than on narrow ones. Where a supplier offers both, vertical-grain is usually worth the modest premium on any board wider than about 6 inches.
Climate also shapes how a cedar fence should be detailed: in consistently dry regions, cedar needs less aggressive moisture management than in humid or rainy climates, where ventilation gaps at the bottom of the fence and more frequent sealant reapplication matter more to keeping rot at bay. None of this changes the board, rail or post counts this calculator returns, but it does shape how the installation and maintenance schedule should be planned once the material order is placed.
Cedar heartwood, the reddish inner wood, carries the species' natural rot resistance, while the pale sapwood band near the bark does not, so a board with a significant sapwood streak on a structural or ground-contact piece is weaker against decay than one that is mostly heartwood, even though both are labeled the same species and grade. Checking boards for sapwood content, especially on posts, is worth the extra look when the lumber yard has mixed stock.
Regional cedar species also vary: Western Red Cedar, common in the Pacific Northwest, and Eastern White Cedar or Northern White Cedar, more common in the Northeast and Upper Midwest, differ somewhat in density and natural oil content, which affects weathering and workability more than it affects the board, rail and post counts this calculator returns for a given run length and height.
Checking a board's grade stamp or mill marking before it goes into the ground is a quick habit that catches a mismatched or mislabeled board before it becomes a structural post buried under concrete, where a mistake is far more expensive to correct.
Häufig gestellte Fragen
Warum Zeder statt kesseldruckimprägnierter Kiefer wählen?
Zeder verfügt über natürliche Abwehrstoffe gegen Pilze und verzieht sich bei Feuchtigkeitsschwankungen deutlich weniger als Kiefernholz.
Welche Schrauben sind für Zedernholzzaune vorgeschrieben?
Verwende Edelstahl A2/A4 oder feuerverzinkte Qualitätsbefestiger. Standard-Zinkschrauben reagieren mit Gerbsäuren und verfarben das Holz schwarz.
Welcher Pfostenabstand ist bei Zeder optimal?
Sechs bis 8 Fuß (ca. 1,8 bis 2,4 m) Achsmaß. In windigen Lagen bieten 6 Fuß höhere Stabilität gegen Windlast.
Drufen die Zaunlatten den Erdboden beruhren?
Niemals. Halte mindestens 5 cm Abstand zum Erdreich oder setze ein opferbares Prallbrett an die Unterkante.
Können Zedernpfosten in Beton faulen?
Ja, wenn stehendes Wasser nicht abfließen kann. Eine 15 cm dicke Kiesschicht unter dem Pfosten verhindert Fäulnis.
Wie viele Riegel benötigt ein 1,8 m höher Zaun?
Drei horizontale 2x4 Riegel pro Zaunfeld verhindern wirksam das Schüsseln oder Verbiegen der Bretter.
Muss Zeder sofort lasiert werden?
Kammergetrocknete Zeder kann sofort behandelt werden; frisches Holz sollte 2 bis 4 Wochen abluften, bis die Ausgleichsfeuchte sinkt.
Wie länge hält ein gepflegter Zedernholzzaun?
Bei richtiger Fundamentdrainage und Nachlasur alle 2 bis 3 Jahre hält ein Zedernzaun 15 bis 25 Jahre.